Construction Period
The construction period is late spring 2010 until August 2012 when the Government of Manitoba opens CCW to traffic. The project will be built in various stages, with a large part of work focusing on creating interchanges that will connect the new CCW infrastructure with existing provincial and municipal infrastructure. Some interchanges will be under construction for the majority of the project term.
The CCW Project is generally completed in four major stages, some of which occurs concurrently:
Area Preparation and Earthworks (topsoil stripping, vegetation clearing, grubbing)
Roadworks and Utilities (granular fill for ramps, traffic detour paving, barriers and fencing)
Structure Works (boring piles, embankment fills, median piers, installing girders/cross braces, baselift, slab installation)
Road and Area Restoration (reseeding vegetation, restoring local environment, final road markings, transferring detour routes to new roadway, traffic signage)
Construction along the alignment area will result in temporary and permanent traffic pattern changes, noise, dust and dirt, heavy equipment movement, vibration and, at times, inconvenience to the public. SLCP will be a good neighbour and endeavour to minimize inconvenience to the public during the construction period. Thank you for your understanding throughout the CCW Project.
The public may see truck and crew movement to and from construction areas outside of these hours. At times, construction work will be required outside of typical daytime hours and SLCP will adhere to existing permit and approval processes.
For more information, please visit the pre-construction, construction and post-construction pages on this site.