SNC Centreport
  • Links >>
  • Sitemap >>
  • Contact Us >>
  • About CentrePort
  • Construction Information
  • Traffic Management
  • Photo Gallery

Photo Gallery

[Show as slideshow]
SNC-Lavalin Constructors Pacific Banner on First Overpass Girder Summer 2011
Structure 5 Basket Placement at MSE Retaining Wall Aug 2011
Structure 5 HMC Placing Clay Over Sand Blankey North MSE Wall Embankment Aug 2011
Structure 5 MSE Headwall at Abutment North Aug 2011
Structure 5 Preparing for Working Platform Aug 2011
Structure 4 Erecting the 300-tonne Crane for Girders Aug 2011
Structure 4 Placing Grouting Base Plates Aug 2011
Structure 4 Placing Sole Plates Aug 2011
Structure 4 Preparing the Crane Pad Aug 2011
Structure 4 Completed Pier Caps Looking South July 2011
New Rebar Cages for Sound Wall Aug 2011
Concrete Pour Preparation for Sound Wall Aug 2011
Structure 5 Stair Tower Assemble North Aug 2011
Structure 2 Installing Wall Panels July 2011
Structure 2 Pouring Final Base Slab July 2011
Structure 3 Placing Burlap July 2011
Structure 1 Pouring Columns July 2011
Project Aerial CCW June 2011
Structure 2 Sturgeon Creek Box Culvert at PTH 101 June 2011
Structure 2 Inside the Box Culvert June 2011
1234567►
Vancouver Website Design by A&G Creative Group